Thursday, April 14, 2016

Updates



















 





In this version, I have focused on one specific view, the administration building. I followed the idea of framing the view. I placed my building in a way where the main theather building lined up with the stairs. For the entry way, I used similar ground tile as the library to make connection. The building serves as a transition way.

Sunday, April 3, 2016

attempt 2

 
 

In this version, I worked on how to connect archive space to the theater spaces. For that, I wanted to create, almost like a corridor, space for only staff- which is separated from the main circulation. However, that space was too large for just circulation. Another problem was the angles didn't have a specific view to focus on. For my next attempt, I will aim to frame the view of administration building, which is at the opposite corner. As for transitional spaces and framing itself, I am using solid- void, as in solid walls for capturing the view and glass walls for the view. For transition between them, I was thinking about using punched openings in between to balance it.

After mid review process- attempt 1

 

This time, I tried to use the grid of the site as my starting point. I still wanted the corner that was next to the library. The angles are trying to create framing view. In this version, My problem was that I didn't have enough circulation space and I my archive space was not connected to the theaters.